PM SURYA GHAR & SIZING ENGINE

Solar Calculation & Subsidy Estimator

Slide your monthly electricity bill to calculate required kW, roof area, and ₹78,000 DBT subsidy.

Interactive Sizing Engine

Configure Your Rooftop Parameters

AP & Telangana Tariff Rate: ~₹7.50 / kWh
₹
Recommended System Size

5.5 kW Rooftop Solar System

Optimized for your ₹5,000 electricity bill in Andhra Pradesh

PM Surya Ghar Subsidy
₹78,000 Direct DBT
Monthly Savings

~₹4,500

Up to 90% reduction
Annual Savings

~₹54,000

Per year in power bills
Required Roof Area

~550 Sq. Ft.

Shadow-free roof space
Annual Generation

~8,256 Units

Clean units produced
Est. Net Outlay: ~₹2,24,500
Capital Payback: ~4.2 Years
25-Yr Net Gain: ₹11.3 Lakhs+
FREQUENTLY ASKED QUESTIONS

Solar Sizing & Financial FAQs

How is solar capacity (kW) calculated from my monthly electricity bill?

In Andhra Pradesh and Telangana, 1 kW of rooftop solar generates approximately 120–130 kWh (units) per month. We divide your average monthly unit consumption by 125 to determine the ideal system size that covers up to 90% of your power bill.

How does the PM Surya Ghar ₹78,000 central government subsidy work?

Under the PM Surya Ghar Muft Bijli Yojana, residential systems qualify for direct benefit transfer (DBT): ₹30,000 for 1 kW, ₹60,000 for 2 kW, and a maximum of ₹78,000 for 3 kW and above. Our team handles portal registration, DISCOM approvals, and inspection liaisoning.

How much shadow-free rooftop area do I need?

A standard rooftop solar installation requires approximately 100 square feet of shadow-free area per 1 kW capacity. For example, a popular 3 kW residential rooftop system requires about 300 sq. ft. of clear RCC terrace or shed space.

What is the typical return on investment (ROI) and payback period?

Because rooftop solar eliminates high-slab DISCOM grid bills and benefits from the ₹78,000 central subsidy, residential systems pay for themselves within 3 to 4 years. Commercial installations benefit from 40% Accelerated Depreciation, achieving payback in 3 years.

NEXT STEP AFTER CALCULATION

Want a 3D Drone Shadow Simulation of Your Rooftop?

Book a complimentary visit by certified Amaravati Solar engineers to survey structural load capacity, DISCOM transformer quota, and 365-day azimuth tilt.