Our End-to-End Solar Process
From your very first conversation to 25 years of uninterrupted clean solar energy — we provide a seamless, engineered, and transparent journey with zero guesswork.

Step 01: Consultation & Energy Audit
Our solar engineers analyze your past 12-month electricity bills, average daylight energy demand, peak wattage spikes, and budget to recommend the most cost-effective solar architecture (On-Grid, Off-Grid, or Hybrid).
Key Deliverables & Documentation
- 12-Month Electricity Bill Analysis & Load Profile
- Optimal Solar Capacity Calculation (kWp)
- Projected Monthly & Annual Electricity Bill Savings
- PM Surya Ghar Muft Bijli Yojana Subsidy Breakdown (up to ₹78,000)
- Financial ROI & Payback Timeline Estimation (3–4 Years)

Step 02: Site Inspection & 3D Shadow Modeling
A certified solar engineer visits your premises across AP & Telangana. We assess roof orientation, tilt angle, civil strength of RCC slab or metal shed, and run 365-day 3D solar shadow path simulations.
Key Deliverables & Documentation
- Drone / Digital Rooftop Boundary Mapping
- 3D Seasonal Shadow Analysis (Parapet, Water Tanks, Trees)
- Roof Civil Load-Bearing Certification
- DISCOM Transformer Feasibility & Sanction Audit
- Optimal Panel Placement & Orientation Angle Plan

Step 03: Customized 3D CAD Design & SLD
Our design team creates customized 3D CAD layouts and Single-Line Diagrams (SLD). We select Tier-1 Mono-PERC / TOPCon bifacial panels, wind-load certified galvanised mounting structures, and electrical protection schematics.
Key Deliverables & Documentation
- Custom 3D CAD Rooftop Blueprint & Panel String Layout
- Single-Line Diagram (SLD) & Electrical Protection Schematic
- Wind-Load Certified Galvanized Structure Design (170 km/h rating)
- Tier-1 ALMM & BIS Certified Component Sizing
- Itemized, Transparent BOM Contract with Fixed Price Guarantee

Step 04: PM Surya Ghar Subsidy & Paperless Loans
Dedicated subsidy team manages complete national portal filing for the ₹78,000 direct bank transfer (DBT) subsidy and paperless low-interest collateral-free bank financing options.
Key Deliverables & Documentation
- PM Surya Ghar National Portal Token Registration
- Direct ₹78,000 DBT Application Documentation
- Paperless Low-Interest Loan Assistance (SBI / Canara / PNB)
- DISCOM Technical Feasibility Approval Sanction

Step 05: Certified Turnkey EPC Installation
Our certified installation crew mounts the system with heavy-duty leak-free mechanical anchors, runs UV-resistant DC cabling in conduit pipes, sets up chemical earthing pits (< 2Ω) and lightning surge arrestors.
Key Deliverables & Documentation
- Precision Rooftop Mounting without Roof Punctures/Leaks
- Hot-Dip Galvanized Mounting Structures (80+ microns)
- Dual Chemical Earthing Pits (< 2Ω) & Class-II SPD Surge Arrestors
- UV-Resistant DC/AC Cabling in Rigid Conduits
- String Inverter Commissioning & Initial Power Testing

Step 06: DISCOM Net-Meter Synchronization
End-to-end liaisoning with APCPDCL, APEPDCL, or TGSPDCL for bi-directional net-meter installation, CEIG electrical safety sanction, and synchronization with IoT mobile monitoring setup.
Key Deliverables & Documentation
- Bi-Directional Net-Meter Installation & Utility Seal
- AP/TS DISCOM Electrical Inspectorate (CEIG) Clearance
- IoT Mobile App Setup for Real-Time Solar Generation Telemetry
- Utility Billing Tariff Calibration to Solar Net-Metering

Step 07: PowerCare 5-Yr Servicing & 25-Yr Support
Every system includes our 5-year comprehensive PowerCare maintenance pack: scheduled bi-annual physical audits, FLIR thermal scans, demineralized module washing, 48-hour resolution SLA, and 25-year performance warranties.
Key Deliverables & Documentation
- 5-Year Free Scheduled On-Site Maintenance Audits
- FLIR Thermal Infrared Camera Hotspot Inspections
- Demineralized Water High-Efficiency Panel Washing
- 48-Hour On-Site Resolution SLA Guarantee
- Official 25-Year Linear Power Output Warranty Handover
Why Amaravati Solar Execution Stands Apart
Most solar issues arise from cutting corners during survey, structural anchoring, and earthing. Here is how our certified process guarantees 25+ years of trouble-free performance.
| Quality Dimension | Amaravati Solar Solutions | Unorganized Local Contractors |
|---|---|---|
| Rooftop Survey & Engineering | 3D Digital Shadow Simulation & Structural Load Audit | Visual estimate without shadow or load modeling |
| Component Quality | Tier-1 ALMM & BIS Certified Mono-PERC / TOPCon Modules | Mixed-tier or non-certified surplus panels |
| Mounting Structures | Hot-Dip Galvanized (80+ microns), 170 km/h wind tested | Standard thin iron angles prone to coastal rust |
| Electrical Safety & Earthing | Dedicated chemical earthing pits (< 2Ω) + AC/DC SPD | Single pipe earthing or tied to building domestic earth |
| DISCOM & Subsidy Filing | 100% turnkey liaisoning until DBT reaches customer bank | Customer left to deal with electricity office alone |
| Post-Sales Service | Dedicated PowerCare 5-Year Comprehensive Maintenance | No formal maintenance; hard to reach after payment |
Book Your Free 3D Rooftop Survey Today
No obligations. Our senior solar engineer will visit your premises, run 3D shadow analysis, and deliver a transparent turnkey proposal within 24 hours.
