One Point of Contact: Your Complete Solar Journey
One trusted partner from first conversation to 25 years of clean energy generation. Zero middlemen, zero finger-pointing, and complete peace of mind.
7 Critical Steps Managed by Your Single Point of Contact
You never have to coordinate between contractors, suppliers, DISCOM offices, or banks. Your dedicated Amaravati Solar engineer oversees every single milestone with 100% turnkey accountability.

Consultation & Energy Audit
Personalized solar energy assessment analyzing your electricity bills, seasonal kWh consumption patterns, and calculating the exact required kW capacity and ROI.

Site Check & 3D Shadow Simulation
Comprehensive on-site physical survey evaluating rooftop civil strength, azimuth angle, structural tilt, and high-precision drone shadow simulation.

Custom 3D CAD Design & Engineering
Tailored 3D CAD rooftop layouts, electrical single-line diagrams (SLD), Tier-1 bifacial panel selection, and cyclone-grade structural blueprints.

PM Surya Ghar Subsidy & Loan Guidance
Complete documentation and national portal filing to ensure the ₹78,000 direct bank transfer (DBT) subsidy and paperless low-interest bank financing.

Certified Turnkey Installation
Leak-free RCC mechanical mounting, hot-dip galvanized structural fastening, UV-resistant DC cabling, dual surge arrestors, and chemical earthing.

DISCOM Net-Meter Synchronization
End-to-end liaisoning with APCPDCL, APEPDCL, or TGSPDCL for bi-directional net-meter installation, CEIG electrical safety sanction, and synchronization.

PowerCare 5-Yr Servicing & 25-Yr Support
Scheduled bi-annual physical audits, FLIR thermal scans, demineralized module washing, 48-hour resolution SLA, and direct engineer access for 25 years.
Single Partner vs Fragmented Contractors
Why 70% of solar customer complaints across Andhra Pradesh stem from dealing with multiple uncoordinated vendors.
Customer Interface
5+ different people: panel dealer, inverter shop, freelance electrician, net-meter agent, AMC provider.
1 Single Dedicated Senior Project Manager handles everything from Day 1 to 25 years.
Responsibility for Faults
Inverter seller blames panels; electrician blames inverter; customer gets stuck in finger-pointing.
100% turnkey accountability. If anything fails, Amaravati Solar inspects and resolves it within 48 hours.
DISCOM Liaisoning
Customer has to repeatedly visit the electricity office for feasibility, net-meter, and test reports.
We manage 100% of DISCOM paperwork, meter testing, and site synchronization without customer hassle.
Subsidy Disbursement
Incorrect document uploads delay or disqualify the ₹78,000 PM Surya Ghar DBT subsidy.
Dedicated subsidy documentation team tracks your national portal application until money hits your account.
Speak With Your Dedicated Solar Project Lead
Have questions about roof structural load, DISCOM net-metering feasibility, or government subsidies? Connect with our senior engineering team directly today.
